Difference between revisions of "Rainwater harvesting: Sizing and modeling"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 3: Line 3:
  
  
===Sizing Tool===
+
===Interactive Sizing Tool===
Sustainable Technologies have produced a rainwater harvesting design and costing tool specific to Ontario[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/]. The tool is in a simple to use Excel format and is free to download.
+
<p>The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download. </p>
 +
 
 +
 
 +
 
 +
<panelInfo>
 +
[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/ RWH Sizing Tool]
 +
</panelInfo>
  
 
===The Treatment Train Tool===
 
===The Treatment Train Tool===
 
<btnPrimary>The Treatment Train Tool</btnPrimary>
 
<btnPrimary>The Treatment Train Tool</btnPrimary>

Revision as of 18:21, 2 June 2017

Rapid[edit]

Cistern size can be estimated by multiplying the depth


Interactive Sizing Tool[edit]

The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.


<panelInfo> RWH Sizing Tool </panelInfo>

The Treatment Train Tool[edit]

<btnPrimary>The Treatment Train Tool</btnPrimary>